Before you apply for anything in Duval, find out whether sewer is available at your address. Where it is, connecting is frequently required rather than optional, and the JEA phase-out programme is actively extending sewer into neighbourhoods that have been on septic for decades.
If sewer genuinely is not available, then you are into the ordinary permitting process, and the authority handling it is the thing to confirm first.
What needs a permit
- A new system on new construction
- Replacing an existing tank or drainfield
- Repairs beyond routine maintenance
- Abandoning a tank when connecting to sewer
- Adding bedrooms or building area that changes the system's rated flow
Sequence
How it usually goes
Find out about sewer
In Duval this genuinely comes first, and it can end the process.
Site and soil evaluation
What the ground will accept, and where a field can legally sit.
Application
To whichever authority currently holds the programme.
Inspection
Before cover. This is not a formality and it is not skippable.
Much of Duval sits inside the Lower St. Johns River basin management action area, and Florida rules adopted in 2023 require enhanced nutrient-reducing systems for certain new installations on smaller lots inside those areas where sewer is unavailable. Whether it applies to your parcel is a parcel-level question, not a county-level one.
Questions
Duval County permit questions
Do I have to connect to sewer if it is available?
Who issues the permit?
Permitting is the long pole
Talk it through before you apply
We will tell you what applies to your parcel rather than what applies generally, and we will be straight when we do not yet know.