Around Yulee and out toward Callahan and Hilliard, private systems are the default and new construction generally means a new septic system rather than a connection. On Amelia Island the considerations shift toward water table and older housing stock.
As everywhere in Florida right now, confirm which authority handles the application.
What needs a permit
- New construction
- Tank or drainfield replacement
- Repairs beyond maintenance
- Additions that change rated flow
- Abandonment where a property connects to sewer
Sequence
How it usually goes
1
Site and soil evaluation
Including well location, which matters on most rural Nassau parcels.
2
Design and sizing
To the house as it will be used.
3
Application
4
Inspection before cover
Scheduled realistically against the drive time out here.
Wells and separation distances
A great many Nassau properties have a private well as well as a septic system, and the required separation between the two is a routine reason a proposed layout has to move. Getting the well location onto the plan early saves a redesign.
A great many Nassau properties have a private well as well as a septic system, and the required separation between the two is a routine reason a proposed layout has to move. Getting the well location onto the plan early saves a redesign.
Questions
Nassau County permit questions
Do you handle permits out toward Hilliard and Bryceville?
Yes, and we will be honest about scheduling rather than pretending the distance is not there.
My property has a well. Does that complicate the permit?
It adds a constraint rather than a complication, provided the well location is on the plan from the start.
Permitting is the long pole
Talk it through before you apply
We will tell you what applies to your parcel rather than what applies generally, and we will be straight when we do not yet know.